Fore River Bridge Opening Schedule 2025. The fore river bridge is scheduled to open at 9 and 11:30 a.m. Greg nanigian & associates (sandler.
The original fore river bridge was built in 1936, and connected weymouth, ma to quincy, ma crossing the fore river. Weymouth, ma โ say goodbye to the old fore river bridge, the new one has opened earlier than expected.
Fore River Bridge Opening Schedule 2025 Images References :